The PMN-2 fuze features an arming delay of approximately 60 seconds.
2.
The arming delay on a PMN-2 is significantly shorter than that of a PMN-1.
3.
Stonefish incorporates arming delays, ship counting and self-sterilisation features which can be configured by the user.
4.
It has a 10-minute mechanical arming delay ( started by removing a pin ) followed by a 30-minute electronic arming delay.
5.
It has a 10-minute mechanical arming delay ( started by removing a pin ) followed by a 30-minute electronic arming delay.
6.
It contained a mercury switch which triggered detonation if the bomb was moved after a 20-second arming delay, which started when the bomb hit the ground.
7.
During the pre-set arming delay ( which could last days or even weeks ) the mine would remain dormant and ignore any target stimulus, whether genuine or faked.
8.
All mines were set with 72-hour arming delays, thus permitting merchant ships time for departure or a change in destination consistent with the President's public warning.
9.
The mine uses an electronic fuze with a ten-minute arming delay and a programmable life of between one hour and one year, which is set in one-hour increments.
10.
Once the mine is emplaced, a pre-set arming delay of up to 60 minutes is initiated, after which the magnetic sensor activates and will trigger the mine if a target passes overhead.